BRIDGE – JARDIN SCULLION

Postech project - Stone bridge in Ascension

The project

Installation of 24 piles overhanging a stream at depths ranging from 50 to 60 feet.
  • Year 2016
  • Implementation Vistech Saguenay
  • Equipment used Excavator: Yanmar Vio-20 equipped with a sun gear and a strong motor Piles: 24 P312L10-24 piles Extensions: 60 EX312L10 extensions Special heads with 12 ” X 12 ” X ¾ ” plate
  • Pile P312L10-24

Partner installers

Our certified experts are your neighbors

Every Postech installation is quick and easy, and there’s a certified expert installer near you who will guarantee that your project starts on the right footing.

Find your installer